Late design changes, disconnected disciplines and manual handovers are among the top reasons power projects miss schedule and exceed budget.
- How design data (tags, equipment, documents) is authored and managed in Unified Engineering with full change control
- How that data is published to AIM to build a structured, as-built asset register accessible to operations teams
- How PI System connects live operational data to the same asset structure — giving O&M teams real-time context from day one
The result: fewer late-stage surprises, faster commissioning, a clean handover to O&M, and a digital twin foundation that supports the asset for its entire lifecycle.
Featured Speakers
![]() |
![]() |

