Capital projects are more constrained and complex than ever. Growing regulations, geopolitical instability, diminishing workforces, unpredictable material costs, data sovereignty and security. Not to mention the novel and emergent types of projects themselves. EPCs and their clients are desperate to see both an increase in efficiency for their industries (that have lagged significantly behind parallel industries over the past decades), as well as some measure of stability to reflect in their risk profiles that work can continue safely and profitably.
The way that steel physically gets put into the ground hasn’t changed much over the years, but detailed advanced work packaging (AWP) is looking to make that process much smoother as detail-rich data moves more smoothly and predictably from design into reality.
Join us in this webinar to learn about how AWP can be used to mitigate some of the modern challenges of realizing a capital project.