Improve Decision-making, Lower Costs and Improve Safety and Reliability with Digital Twin technology
Learn how a large oil and gas company was able to save up to 60% of their time in planning and executing a Risk-Based Inspection program to address Corrosion Under Insulation (CUI). In doing so, they increased worker productivity, reduced exposure to safety risks and decreased production downtime due to pipe failures.
In this webinar, you'll learn how Visual APM is delivering increased value including:
- Number of site visits reduced by up to 2/3
- Time spent in the planning process reduced by up to 60%
- Improved quality of planning
- Eliminated need to manually log results into office PC
- Increased accuracy of data acquired in the field
- Reduced use manual mark-up (ISO drawings)
- Increased reporting capabilities
Duration: One Hour